ENGINEERING PROJECT CASES

High-performance metal separators for optimal granule purity

High-performance metal separators for optimal granule purity

Automated assembly with melting capability

Automated assembly with melting capability

Installation of Raw Material Silos at Gamma-Wopla

Installation of Raw Material Silos at Gamma-Wopla

Cooling Installation on the roof at Enbi Plastics

Cooling Installation on the roof at Enbi Plastics

The automatic assembly of steel rings with quality control, using 6-axis robots.

The automatic assembly of steel rings with quality control, using 6-axis robots.

Complete Resource Transportation System

Complete Resource Transportation System